TI (Tenant Improvements) plans are construction documents prepared to modify an existing commercial space to meet the specific needs of a new or existing tenant. These plans typically show interior alterations such as new partitions, finishes, mechanical, electrical, and plumbing modifications, accessibility compliance, and life-safety requirements, while generally leaving the building’s structural shell unchanged.

What’s Included in TI Plans
- Power plans
- Lighting plans
- Lighting fixture schedule
- Lighting controls and switching
- Emergency lighting and exit lighting
- Load calculations
- Panel schedules
- Low-voltage systems (if included)
- Plumbing floor plan
- Fixture schedule
- Water, waste, and vent layouts
- Grease interceptor (if applicable)
- Water heater sizing
- Backflow prevention (if required)
- Gas piping (if applicable)
- HVAC plans (existing vs. new)
- Equipment schedules
- Ductwork layout
- Outside air / ventilation calculations
- Thermostat locations
- Control sequences (if required)
- Title 24 energy compliance documentation (CA)
- Kitchen hood systems (if applicable)
- Cover sheet with project information
- Project description (Tenant Improvement scope)
- Code analysis:
- Occupancy classification (existing & proposed)
- Construction type
- Fire sprinkler status
- Fire-resistance ratings (if applicable)
- Allowable area and height - Applicable codes & standards
- Sheet index
- Vicinity map (sometimes required)
- Project notes & general notes
- Existing floor plan (demolition plan if required)
- Proposed floor plan
- Partition types & wall details
- Door and window schedules
- Finish plan and finish schedule
- Reflected ceiling plan (RCP)
- Signage (interior and exterior if altered)
- Accessibility details:
- Path of travel
- Restrooms
- Clearances, mounting heights
- Door hardware
- ADA / CBC Chapter 11B notes
- Accessible routes and door clearances
- Restroom compliance details
- Signage requirements
- Path-of-travel upgrades (if triggered)
- ADA / CBC Chapter 11B notes
- Accessible routes and door clearances
- Restroom compliance details
- Signage requirements
- Path-of-travel upgrades (if triggered)
- Energy code forms (e.g., Title 24)
- Lighting compliance documentation
- Mechanical compliance documentation
- Envelope compliance (if modified)
- CALGreen checklist (CA)
- Special inspection notes
- Deferred submittals list
- Statement of Special Inspections
- Hazardous materials acknowledgment
- Disabled access compliance statement
- Fire sprinkler modifications
- Fire alarm modifications
- Hydraulic calculations (if required)
- Fire protection notes
- Demolition plans
- Notes identifying removed vs. existing elements
- Phasing plans (for occupied buildings)
(Often not required unless walls are load-bearing or equipment is added)
- Structural notes
- Framing details for new walls
- Anchoring and bracing details
- Equipment support details
- Structural calculations (if required)
Optional Add-ons (Project Dependent)
- Health Department plans (restaurants)
- Acoustic reports
- Hazardous materials survey
- Structural observation notes
- Commissioning requirements
TI (Tenant Improvements)